1. Hoover Dam
... the time, project. Once the players were in place and the requisite performance bond funds were available, all attention turned to the submission of a winning bid. The scoop from inside Washington was that the Reclamation Service was not going to waste time with bids designed to pad the pockets of any private firms. Their engineers had estimated the cost of the ... . Every week 12 tons of fruit and vegetable were shipped in, along with five tons of meat and two-and-a-half tons of eggs. For $1.50 a day, a man received three square, all-you-can-eat, meals. As the construction project wore ...
- Word Count: 1889
- Approx Pages: 8
- Grade Level: High School